Current project is about demolition of an existing building and construction of a new one. The new designed building is a 1,5- storey single house with an L-shaped floor plan and wooden exterior design.
The demolition plan of the building considers both- the demolition process itself and the later disposal of the waste produced. The design of the new building mainly deals with energy efficiency, fire safety and exterior design.